Hotline: 1900986813
  • LEADING COMPREHENSIVE LOGISTICS SOLUTION<br>IN VIETNAM

The Cluster of Three Grade A Multi-Functional Warehouses at Bac Giang International Logistics Center Is Ready for Operation from February 2026

0/5
(0 vote)

As global supply chains continue to restructure and the demand for logistics optimization increases, modern warehousing infrastructure plays a critical role in enhancing business competitiveness. In line with this trend, Dolphin Sea Air Services Corp. officially develops a cluster of three Grade A multi-functional warehouses (KN1 – KL1 – KL2) at the Bac Giang International Logistics Center, scheduled to be ready for operation from February 2026.

Table of contents

 

The project is comprehensively invested in terms of scale, technology, and connectivity, aiming to serve a wide range of warehousing, transshipment, import–export, e-commerce, and EPE (Export Processing Enterprise) needs for both domestic and international businesses.


Overview of the Grade A Multi-Functional Warehouse Cluster

The KN1 – KL1 – KL2 warehouse cluster covers a total area of nearly 43,000 square meters, planned and developed in accordance with modern logistics warehouse standards. The design allows flexible operations for various business models, including manufacturing, trading, logistics service providers, and freight forwarders.

Detailed warehouse areas:

  • KL2 Warehouse: 8,930 m²

  • KL1 Warehouse: 18,900 m²

  • KN1 Warehouse: 14,886 m²

The cluster is positioned as a key logistics transshipment hub in Northern Vietnam, particularly suitable for:

  • Bonded warehouses

  • E-commerce fulfillment warehouses

  • EPE warehouses

  • Transshipment and express delivery (courier) operations

Có thể là hình ảnh về bản đồ, máy bay và văn bản cho biết '8 KHOKL2 KHO KL2 8.930 8.930m2 m² 8 KHO KHOKL1 KL1 18.900 18.900m² m² QuétmăZalo Quét mã Zalo ተ፡ር 요 KHO KHOKN1 KN1 14.886 m²'


Distinct Advantages in Infrastructure and Operations

One of the project’s outstanding highlights lies in its synchronized infrastructure investment from the design phase, enabling businesses to optimize operational efficiency immediately upon commencement.

The entire warehouse cluster is equipped with 100% modern dock levelers, supporting fast and safe cargo handling while reducing labor costs. In addition, automatic fire protection systems and 24/7 security camera surveillance ensure cargo safety and strict compliance with operational standards.

Notably, the project offers strong transportation connectivity advantages, allowing direct trucking to China with G-license permits and being located along the GMS (Greater Mekong Subregion) corridor. This significantly shortens cross-border transit times and reduces logistics costs for import–export enterprises.


Strategic Location at Bac Giang International Logistics Center

The KN1 – KL1 – KL2 warehouse cluster is located at the Bac Giang International Logistics Center, along National Highway 1A, Tien Phong Ward, Bac Ninh. This strategic location plays a vital role in Northern Vietnam’s transportation and logistics network, providing fast connections to key industrial zones, seaports, airports, and major economic centers.

This location enables businesses to:

  • Optimize domestic and international transportation lead times

  • Seamlessly connect production and distribution supply chains

  • Enhance rapid order fulfillment capabilities, especially for e-commerce and express delivery


Integrated Logistics Solutions for Businesses

Beyond conventional warehouse leasing, Dolphin Sea Air positions the Grade A warehouse cluster in Bac Giang as an integrated logistics solution, supporting businesses across the entire operational chain—from storage and transshipment to import–export activities.

With many years of experience in logistics, international transportation, and customs consulting, Dolphin Sea Air delivers added value through:

  • Consulting on warehouse models tailored to specific cargo characteristics

  • Connecting multimodal transportation services

  • Supporting customs procedures, particularly for bonded and EPE warehouses

  • Optimizing costs and timelines throughout the logistics value chain


Early Warehouse Registration Opportunities

Scheduled for operation from February 2026, the KN1 – KL1 – KL2 warehouse cluster is currently accepting early registration, prioritizing businesses with long-term leasing needs and those seeking prime warehouse locations aligned with future business plans.

Early registration allows businesses to:

  • Proactively plan logistics operations and production expansion

  • Secure suitable warehouse capacity amid rising market demand

  • Fully leverage the project’s strategic location and modern infrastructure


Contact Dolphin Sea Air

For detailed information on warehouse layouts, operating solutions, and early registration policies, please contact:

Dolphin Sea Air Services Corp.
- Hotline: 1900 986 813
- Email: info@dolphinseaair.com
- Website: www.dolphinseaair.com

Share
Write comment
Your email will not be displayed publicly, required fields are marked *

Related news

In April, Dolphin Sea Air is expanding its workforce nationwide to support business growth. We are l..
Large-Scale Development with a Modern Vision The project spans 172.6 hectares and is planned as a..
Among these, FCL (Full Container Load) shipping has become a preferred choice for many import-export..

Featured News

1. What is the selectivity of customs declaration form ? The practice of overseeing and coordinat..
1. What is an international sea route? An international sea route, also known as an international..
1. Varieties of sea containers available nowadays The variety and abundance of marine containers ..